Well, at least we’ve got a hole dug where the new sign is going to be:
As you can see, we’ve got some drainage issues!
Well, at least we’ve got a hole dug where the new sign is going to be:
As you can see, we’ve got some drainage issues!
The URI to TrackBack this entry is: https://nathanhyde.com/2008/03/16/sign-installation-step-1/trackback/
Leave a Reply